Vocational Technical Institute (Tsing Yi)
Completion Date: In Progress
Title: Installation of Automated Check-in Conveyor System including E&M System, Programming, SCADA, Vision detection & Robot Application.
Nestlé Hong Kong Company
Completion Date: 6/2019
Title: System Migration for existing cooling PLC and SCADA control system in a 24 hrs operating live system, this is a big challenging on not only the technical skills, also the contingency and back-up arrangement.
Nestlé Hong Kong Company
Completion Date: 1/2019
Title: Replacement of the Main Control Panel, Upgrade the Electrical installation, Pneumatic System and developing new Alley Bradley PLC & Touch screen programme for Dairy Product Production Line
Nestlé Hong Kong Company
Completion Date: 12/2018
Title: System upgrade of Basket Recycling System including replacement of Main Control Cabinet & Local Control Panel, adding new automatic function and Test & Commissioning.
BCI Engineering
Completion Date: 4/2018
Title: Installation of new power distribution system and optimize the man & machine control system for the “Beer” production line.
Bridgestone Aircraft Tire Company
Completion Date: 4/2017
Title: Pneumatic air supply system modification works
Bridgestone Aircraft Tire Company
Completion Date: 8/2017
Title: Pneumatic air supply system modification works, Replace and redesign the existing Pneumatic air supply system, increasing the output performance and the stability of the machine
Cathay Pacific Catering Services (H.K) Ltd
Completion Date: 12/2016
Title: Installation of interlocking safety system