Industrial Control & Automation

MTR gate with sick sensor

LocationChai Wan MTR

Siemens HMI schedule for peak and off-peak operating modes

HMI with custom program for MTR, install with Trial of Peak & Non-peak Flexible GHD Timer Control for Urban Line (URL) -Automatic Platform Gate (APG)

Introduction: WYE was responsible for integration of a new safety monitoring add-on system for the MTR, collaborating with SICK and Siemens. To provide an intelligent layer for enhanced passenger safety and operational efficiency, WYE engineered a custom automation program from scratch. The project encompassed hardware installation and software development, including SICK sensor placement, Siemens PLC logic configuration, and custom HMI integration for a flexible Gap Hanging Detector (GHD) timer control.

WYE is capable offer custom, enterprise-scale solutions compatible with rigorous MTR standards, providing full technical support, installation, and custom programming for advanced sensors and HMI interfaces.

Results

The implementation of this add-on system provides MTR with an intelligent, multi-layered safety barrier that actively prevents door obstructions causing accidents. The introduction of flexible peak and non-peak timing control significantly optimizes station efficiency.

Your next project

Ready to engineer what’s next

Tell us about the system, current challenge and intended timeline. Our engineering team will route the enquiry to the right solution.

Send a project brief
Office
Flat L, 8/F, Houston Industrial Building, 32–40 Wang Lung Street, Tsuen Wan, New Territories, Hong Kong
Registered Electrical Contractor
027552