Industrial Control & Automation

Sewage Treatment Works SCADA upgrade (Shek Wu Hui)

LocationShek Wu Hui STW

SCADA monitoring screen for sewage-treatment process equipment
  • Jun 16

Introduction: WYE was responsible for executing a high-availability architectural lifecycle upgrade of the core SCADA, database, and PLC network for Bioreactors 3 & 4 (BR3 & BR4). The project established a synchronized redundant server cluster and a unified data highway, providing real-time telemetry and advanced historical process analytics under a continuous-operation environment.

The work

  • System Upgrades & Live Migration: Executed a "live" hot-swap upgrade of the plant's core Siemens Simatic WinCC SCADA system from V7.0 to V8.1. Performed comprehensive pre-cutover database backups to eliminate process monitoring downtime.
  • Redundant Infrastructure Deployment: Provisioned and configured six sets of enterprise-grade HPE ProLiant server clusters (OPC, Application, and AVEVA Historian systems) with hardware RAID arrays and automatic failover topologies.
  • Telemetry Integration & Programming: Expanded PLC hardware by installing Analog Input (AI) modules. Rewrote control logic blocks to scale and linearize raw analog inputs from field temperature sensors at BR3 & BR4, and programmed critical SCADA alarm thresholds and interlocks.

Result

Secures continuous process visibility and safeguards biological treatment stages from bio-bacterial collapse. It streamlines multi-vendor network compatibility into a unified, high-availability platform with zero public utility service interruption.

Your next project

Ready to engineer what’s next

Tell us about the system, current challenge and intended timeline. Our engineering team will route the enquiry to the right solution.

Send a project brief
Office
Flat L, 8/F, Houston Industrial Building, 32–40 Wang Lung Street, Tsuen Wan, New Territories, Hong Kong
Registered Electrical Contractor
027552